After taking down all the drywall in the family room we had a lot of work to get it ready to drywall again. We put in lights in the ceiling, re-did the electrical, got the wall ready for the tv, and replaced some of the 2x4 framing. There was damage to some of the framing from a past leak. While the ceiling was open we also put in some extra insulation. We removed the cabinet in the corner and cut it in half. I painted it and made a new top so that we had a place to put dvds and dvd player.
![]() |
| McKenzie wants to help |
![]() |
| Kristin coming out from the ceiling after putting in insulation |
![]() |
| Kristin in the ceiling putting in insulation |
![]() |
| The temporary support wall while we replace 2x4s |
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)

.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)